
Gold Data 1 Submarine Cable a game changer for Mexico’s fast-growing innovators
Gold Data, a leading, multinational, and award-winning technology company, is proud to announce that it is building the first cable system in the Gulf of Mexico which will connect Miami in Florida with strategic points in Mexico: Mexico City, Cancun, and Queretaro.
The first to reach Mexico City in 22 years, the cable system will play a key part in empowering the fast-growing Mexico data market, as its state-of-the-art topology network will revolutionize Mexico’s connectivity by reducing latency by up to 35%.
This is key for enterprises and content providers which need reliable, low latency, high quality connectivity.
The Investment
This US$150 million investment is the third and final phase of Gold Data’s Mexico network expansion. It will complement the company’s low-latency underground network, which interconnects the most important Data Centers in the country, including Queretaro, Mexico City, Veracruz and Cancun.


The Route
Gold Data 1 Submarine Cable will connect Mexico and Florida with 1,899 linear km on the Veracruz (Mexico) to Naples, (USA) trunk, with another 423 km fiber branch to Cancun (Mexico).
The System
The system will boast 10 fiber pairs:
- 2 Pairs of Fiber express from Veracruz (Mexico) to Naples (USA).
- 2 Pairs of Fiber Omnibus from Veracruz (Mexico) to Cancun (Mexico) to Naples (USA).
- 6 Pairs of Fiber express from Cancun (Mexico) to Naples (USA).
The Design
The cable is designed for a capacity of 250Tb/s (25 Tbps per Fiber Pair).
The Timeline
The construction time is estimated at 31 months with a delivery date in 2025. The lifespan of the cable will be 25 years.
Subsea System GeoMesh with 100% brand new underground network
NAP of the Americas to Naples, Florida
Route Naples - NAP AmericasINFRASTRUCTURE Underground Fiber System
FIBER TYPE G.652D
TOTAL FIBER OPTIC DISTANCE 220 KM
MINI TRENCHING DISTANCE 200 KM
MINI-TRENCHING DIMENSIONS 20 CM x 100 CM
IN CITY MANHOLE LOCATION 300 MTS
INTERCITY MANHOLE LOCATION 600 MTS


Veracruz to Mexico City
Route Mexico City - VeracruzINFRASTRUCTURE Underground Fiber System
FIBER TYPE G.652D
TOTAL FIBER OPTIC DISTANCE 500 KM
MINI TRENCHING DISTANCE 450 KM
MINI-TRENCHING DIMENSIONS 20 CM x 100 CM
IN CITY MANHOLE LOCATION 300 MTS
INTERCITY MANHOLE LOCATION 600 MTS
Queretaro to Mexico
Route Queretaro - MexicoINFRASTRUCTURE Underground Fiber System
FIBER TYPE G.652D
TOTAL FIBER OPTIC DISTANCE 190 KM
MINI TRENCHING DISTANCE 169 KM
MINI-TRENCHING DIMENSIONS 20 CM x 100 CM
IN CITY MANHOLE LOCATION 300 MTS
INTERCITY MANHOLE LOCATION 600 MTS

A Winning Partnership
Gold Data 1 Submarine Cable will be built in partnership with the most important players in the submarine cable market


